Beta: full access, everything free and open while we build.

New patio over the old one — sometimes brilliant, sometimes a disaster

Going over the top saves the dig-out and the skip. It also raises your levels by 50mm and inherits every problem the old patio has. Here's how to tell which side of that trade you're on.

Your patio

Size · 1 of 5

5 × 3 m15 m²

How big is it?

Length
Width

5 × 3 m15 m²Indian sandstonean old patioAnywhere in the UKStack bond

Typical installed£1,410–2,210

When over-the-top works

The old patio is sound, flat within 10mm, drains away from the house, and you can afford the height: 50mm of build-up still leaves you 150mm below the damp-proof course.

When it doesn't

Rocking slabs, hollow spots, or moss that never dries mean the base underneath has failed — a new layer fails with it, just slower. That's the lift-and-relay estimate in the calculator above.

The honest comparison

Run the calculator both ways: "an old patio" prices the lift-and-relay; if yours is sound concrete, "concrete" prices the over-the-top route. The difference is what the dig-out is really costing you.

Keep planning